Skip to content
San Diego Microcement Logo
  • About
  • Services
    • Bathrooms
    • Floors
    • Kitchens
    • Showers
    • Walls & Feature Areas
  • Gallery
  • Blog
  • Contact Us
  • About
  • Services
    • Bathrooms
    • Floors
    • Kitchens
    • Showers
    • Walls & Feature Areas
  • Gallery
  • Blog
  • Contact Us
  • Home
  • About
  • Services
    • Bathrooms
    • Floors
    • Kitchens
    • Showers
    • Walls & Feature Areas
  • Gallery
  • Blog
  • Contact Us
Request a Consultation
Request a Consultation
Warm terracotta microcement shower enclosure with illuminated niche, rain shower head, and brass fixtures in San Diego

Microcement Showers

Create a seamless, waterproof shower with microcement finishes designed for wet environments, durability, and a clean, modern look.

About the Service

Our microcement shower installations are designed specifically for continuous water exposure. We take a system-based approach that includes proper surface preparation, integrated waterproofing, and layered microcement application.

Unlike tile, microcement creates a smooth, grout-free surface that reduces maintenance while maintaining a refined architectural aesthetic.

Why Choose Microcement for Showers

Microcement Is a Great Fit If You Want:

Seamless, grout-free shower surfaces

Integrated waterproofing beneath the finish

Visually expands small shower spaces

Easy to clean and maintain

Our Process

Simple. Clean. Professional.

Seamless microcement feature wall with arched display niches and ceramic vases in San Diego

Review Shower Layout & Design Goals (Pre-Installation): On-site moisture testing, drainage slope inspection, and color/texture sample selection.

Evaluate & Prepare Substrates (Day 1): HEPA dust-controlled diamond grinding, crack stabilization, and structural priming of existing tile or cement board.

Install Waterproofing System (Day 2): Seamless liquid waterproofing membranes reinforced with alkali-resistant fiberglass mesh across wet zones, niches, and corners.

Apply Layered Microcement (Days 3–4): Hand-troweled polymer-modified base coats and ultra-fine decorative finish layers with precision sanding between applications.

Sealing, Curing & Final Walkthrough (Days 5–10): Multi-coat UV-stable polyurethane sealing on Day 5, followed by a 5–7 day curing window before full shower water exposure.

Is This Service Right for You?

Microcement can be applied directly over sound existing shower tiles without heavy demolition, saving time and avoiding mess. However, proper slope, drainage, and substrate integrity are essential for long-term waterproofing performance. Existing tiles must be structurally firm, fully adhered, and free of moisture damage to ensure a smooth, seamless, grout-free shower finish.

Microcement vs. Traditional Tile in Showers:


• Grout Elimination: Eliminates porous grout joints that harbor mold, mildew, and water leaks over time.
• Seamless Waterproofing: Provides a continuous, 100% waterproof barrier sealed with polyurethane instead of individual tiles.
• Low Maintenance: Requires no harsh chemical scrubbing or regrouting throughout its lifespan.
• Thermal Flexibility: Reinforced layers expand and contract without cracking or popping off the wall.
Brushed brass rain shower head mounted on smooth microcement bathroom wall in San Diego
Microcement Showers are a great fit if you:
  • Want a modern, seamless shower design
  • Prefer minimal grout and clean lines
  • Are upgrading or remodeling an existing shower
  • Value long-term durability over quick cosmetic fixes

FAQ

Frequently Asked Questions

Find answers to common questions about microcement, installation, and project planning.

Can microcement be applied over existing tile or surfaces?
Yes. Microcement can be applied directly over existing tile, concrete, or wood surfaces without heavy demolition. Applied at just 2–3mm thickness, it covers existing finishes to create a seamless, highly durable surface with zero grout lines. Existing conditions must be evaluated first to ensure proper bond and long-term performance.
Can microcement be installed over existing shower tiles?
Yes, as long as the tiles are structurally sound and firmly bonded. If tiles are loose, hollow, or have active water leaks, tile removal is required first. Overlays add only 2–3mm, so drains, thresholds, and plumbing fixtures remain easily compatible.
How does microcement hold up in a wet shower compared to traditional tile?
Microcement outlasts traditional shower tile in wet environments primarily because it eliminates grout lines—the main point of water failure and mold growth. While traditional tile relies on porous grout that degrades, stains, and absorbs moisture over time, microcement creates a 100% continuous, seamless waterproof surface sealed with high-grade polyurethane. It offers superior resistance to standing water, thermal expansion, and harsh cleaning agents without cracking or leaking.
How should I prepare my home before a microcement shower installation?
Before our crew arrives, please remove all toiletries, bath mats, towels, and fragile decor from the bathroom and adjacent hallways. Ensure existing plumbing valves and drains are functioning properly, and keep pets away from the work area. Expect moderate equipment noise during Day 1 surface grinding, though our HEPA dust-extraction systems keep your home clean and minimize disruption.
How long does microcement take to cure in San Diego’s coastal climate before I can use my shower?
Active installation typically takes 4 to 5 working days, followed by a 5 to 7 day curing window before full water exposure so the polyurethane sealer reaches maximum chemical hardness. In coastal San Diego communities—such as La Jolla, Del Mar, Coronado, and Encinitas—cool marine-layer mornings and ocean humidity can slightly extend drying intervals between coats compared to inland areas, so our team monitors surface moisture on-site before sealing.

Service Area

Serving San Diego County & Southern California

  • San Diego
  • Alpine
  • Bankers Hill
  • Barrio Logan
  • Bay Park
  • Bonita
  • Bonsall
  • Carlsbad
  • Carmel Valley
  • Casa de Oro
  • Chula Vista
  • Clairemont
  • College Area
  • Coronado
  • Crest
  • Del Cerro
  • Del Mar
  • Downtown San Diego
  • East Village
  • El Cajon
  • Encinitas
  • Escondido
  • Fallbrook
  • Golden Hill
  • Hillcrest
  • Imperial Beach
  • Jamul
  • Kearny Mesa
  • La Jolla
  • La Mesa
  • Lakeside
  • Lemon Grove
  • Linda Vista
  • Little Italy
  • Mira Mesa
  • Mission Beach
  • Mission Hills
  • Mission Valley
  • National City
  • Normal Heights
  • North Park
  • Ocean Beach
  • Oceanside
  • Pacific Beach
  • Pine Valley
  • Point Loma
  • Poway
  • Ramona
  • Rancho Bernardo
  • Rancho Peñasquitos
  • Rancho San Diego
  • Rancho Santa Fe
  • San Carlos
  • San Marcos
  • Santee
  • Scripps Ranch
  • Serra Mesa
  • Solana Beach
  • South Park
  • Spring Valley
  • Tierrasanta
  • University City (UTC)
  • University Heights
  • Valley Center
  • Vista
  • Winter Gardens

Show All Locations

Thinking About a Microcement Shower?

Let’s see if it’s right for your space.

Schedule Free Estimate
San Diego Microcement Logo
  • Home
  • About
  • Services
  • Gallery
  • Blog
  • Home
  • About
  • Services
  • Gallery
  • Blog

(619) 759-5559

@microcementsandiego

Microcement installations are performed by Evergreen Remodeling & Construction — Licensed General Contractor, CSLB #1147677.

Copyright © @microcementsandiego